Not my corridor at all, but the hold or pay question is the one I lose sleep over at my size. For a small brand, duty paid now and refunded within twelve months is cash I cannot spend on the next production run, while a bill of entry left waiting means warehouse rent ticking every day the certificate is still in the post.
So the follow-up I would want answered: when you have run this before, how long did a retrospective certificate actually take to arrive, and did the storage cost ever beat the duty you were trying to save?
Melody, the question I would add for anyone choosing to hold: who insures the cargo while it waits for the certificate? Putting it into a bonded warehouse by choice, to wait for paper, is storage outside the ordinary course of transit, and a standard cargo policy can end on unloading there. The waiting itself is delay, which the policy refuses by name. I have turned that claim down more than once. So the rent is one cost of holding. The uninsured weeks are the other.
