Range, before issuance. Then the B/L shows the actual port, inside that range. Amending after it sails is a bet on the buyer.
Bev's range is the right fix for the bank. Put the road inside it too. Since September that same carrier has been landing some Khor Fakkan boxes at Fujairah, trucking them in bond to Jebel Ali, and calling Jebel Ali the final port. A range that names only the ports the ship calls can still miss the port the paperwork ends up showing.
I see the same on my border: the pedimento names one crossing, the truck takes another bridge, and nobody in the office three weeks earlier asked which. Renata, are buyers writing the range by country, or port by port?
