Sorry, I move machinery, not fruit, so I cannot answer the box question from experience. But one paper question, if I may.
When the express sailing moved its call to Valparaíso, what happened to the documents? If a buyer paid by credit and the credit named San Antonio as port of loading, my understanding is the bill of lading has to show that port, and a different one is a discrepancy. In my own market we would ask the buyer for an amendment before loading, and that takes days a cherry does not have.
So was a second port written into the credits ahead of peak, as "any Chilean port" or similar? Or did the banks simply accept the change this time? I would like to know which it was.
Grain never names one port in a credit, for exactly this reason. The contract says Up River Parana ports, the credit copies the range, and the bill shows the actual port inside it. A bill naming only the area is still discrepant.
Whether Chilean fruit credits carry a range, I do not know. If they name San Antonio alone, that is the plan B nobody wrote.
